New Pit Lane Benching at Deerdale

With the pit lane benching looking a bit tired and past its best the committee decided to demolish it and replace it with a new one. We decided on a metal frame work design to ensure a long life with heavily treated plywood on top.

32679698 2266914436726303 6409761505528512512 n

Next step was to dig down to sink the support posts into the ground.

The frame work was constructed in small manageable sections and the legs post creted in.Making the table  in small sections made it easier to get it level and straight. 

33020166 10214336909448508 3510905657312149504 n

After the first section was fitted it was just a repetition to the end of the pit lane taking extreme care to make sure all the legs were vertical and true. 

32967683 10156231979931718 8674084194013413376 n

 

Ready for painting and fitting of the new top

 

 

What a transformation.

Social Facebook Widget

Event Cart

Your cart is empty